Boat House Redevelopment Plans

Feb 4, 2024

A number of people who were unable to attend the meeting on 14th January have expressed an interest in the redevelopment plans for the boathouse. In the new plans the entire boathouse behind the clubroom will be demolished and rebuilt, retaining the clubroom and two short boat bays facing the river. Behind the clubroom there will be five new boat bays parallel to the river, extending the footprint of the building to the side of the current building line. The plans also show provision for a kitchen, bar, crew room and four changing rooms on the first floor above the new boat bays and a gymnasium on the second floor. You can view the elevationsfloor plans and sections in pdf format by following these links.

Related Posts

Hammersmith Head

Hammersmith Head

The club entered six crews for the Hammersmith Head this year, rowing over 4,000M from Chiswick Bridge to Hammersmith Bridge. Our star crew was the Open Masters H eight, which won the Open Masters E/F/G/H handicap category in a time of 11 min. 47.6 sec, the fastest...

read more
Quintin Head Cancelled

Quintin Head Cancelled

Sadly, the decision had to be taken on Friday to cancel the Quintin Head, as the PLA fluvial flow flag was set to 'red' and there was the likelihood of more rain before race day. As the fates would have it, the flag turned to 'amber' on Saturday, but club members who...

read more
Plum Puddings Race

Plum Puddings Race

Our annual plum puddings race was held on Sunday, followed by a Christmas party. There were 22 crews listed to take part in the race but unfortunately Paul Gunn's scratch coxless four encountered steering problems on their way to the start and decided not to risk it,...

read more